Submitted on 05-03-2012

Transport requirement:Other
Pick up Postcode:TA3 5DN
Delivery Postcode/Location:Hinkley Power Station 'C'
Transport Details:44 tonne gvw, preferably open flat trailers, roll back roof curtain siders considered. Approx.6165 loads between Aug 2014 and Oct 2015. Transporting concrete sections, weighing up to 4.8tonnes each. We are currently tendering for the inlet and outlet cooling water tunnels for the new power station planned for Hinkley Point in Somerset. Concrete production will take place at the 'mothballed' Tarmac Precast factory at Henlade. We are looking to contact a 'local' haulier who is capable of doing the job.